NERC Submits Comments in Response to NOPR on Generator Verification Reliability Standards
- Filter By Electric Reliability Law Blog
On November 25, 2013, in Docket No. RM13-16, NERC submitted comments in response to FERC’s September 19, 2013 Notice of Proposed Rulemaking (NOPR) proposing to approve the following Reliability Standards: MOD-025-2 (Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability), MOD-026-1 (Verification of Models and Data for Generator Excitation Control System or Plant Volt/Var Control Functions), MOD-027-1(Verification of Models and Data for Turbine/Governor and Load Control or Active Power/Frequency Control Functions), PRC-019-1 (Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection), and PRC-024-1 (Generator Frequency and Voltage Protective Relay Settings).