| Insights | Nuclear Update Site

NRC Issues Draft Standard Review Plan Section Revision Related to Open Phase Conditions in Electric Power System

The NRC is requesting comment on a draft new Branch Technical Position (BTP) 8-9 “Open Phase Conditions in Electric Power System.”   The NRC is also requesting comment on a related draft Revision 5 to Section 8.1, “Electric Power – Introduction,” of NUREG-0800, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants.” Comments are due by July 21, 2014.