NERC Submits Proposed Modifications to Several Reliability Standards to Address Dispersed Generation
- Filter By Electric Reliability Law Blog
On February 6, 2015, in Docket No. RD15-3, NERC submitted a petition seeking FERC approval of the following proposed Reliability Standards: PRC-004-2.1(i)a, Analysis and Mitigation of Transmission and Generation Protection System Misoperations; PRC-004-4, Protection System Misoperation Identification and Correction; PRC-005-2(i), Protection System Maintenance; PRC-005-3(i), Protection System and Automatic Reclosing Maintenance; and VAR-002-4, Generator Operation for Maintaining Network Voltage Schedules. NERC is submitting the proposed modifications to existing standards to better address the characteristics of dispersed generation resources.
To view FERC’s filing, click here