NERC Submits TOP and IRO Reliability Standards Quarterly Status Report
- Filter By Electric Reliability Law Blog
On January 2, 2015, in Docket Nos. RM13-12, RM13-14, and RM13-15, NERC submitted its Fourth Quarter 2014 status report related to FERC’s proposed revisions to the Transmission Operations (TOP) and Interconnection Reliability Operations and Coordination (IRO) Reliability Standards. The status report provides an update on NERC’s evaluation of the reliability concerns raised by FERC’s November 21, 2013 NOPR proposing revisions to the TOP and IRO standards.
To view NERC’s status report, click here.